| Usage | Gift packaging, Human hair packaging, Apparel packaging, Beauty packaging, Wine packaging, Food packaging, Watch packaging, flower packaging, Mobile phone packaging, Power bank packaging, Electronic products packaging, Candle packaging, Jewelry packaging, Glassy packaging, Bottle packaging, Chocolate packaging, Macarons Packaging, Towel packaging, Socks packaging, etc |
| Material | 900-1500gsm rigid paper board + C2S paper/kraft paper/fancy paper/velvet etc. |
| Finish |
1) Glossy/Matte lamination 2) Complete or Spot UV 3) Embossing and Debossing 4) Gold or silver foil stamping 5) Varnishing |
| Size/ Color/ LOGO | Accept customized size/color/LOGO |
| Quotation | Depending on Your Specific Requirements |
| MOQ | 1000PCS |
| Lead time | 18-25days |
| Sample time | 3-5days |
| Certificate | ISO 9001:2015, FSC |
| Advantages | Applicable to a wide range of folding flat, reduce storage space and transportation costs, beautiful quality |
















We have 10 machines in total, including Paper cutting machine, Auto-Forming product machine, Auto Lamination Machine, Spot UV machine, Foil stamping Machine, and Digital Printing sample machine.
1) We have 4 production lines. Each production line is assigned 1 QC inspector who checks quality directly on the production line.
2) We have 2 Quality Inspectors in the warehouse who conduct random checks before cargo is dispatched. If any issues are found, the shipment is rejected and held back.
1) Upon order confirmation, we will send you the final design for confirmation.
2) After design approval, we will produce a physical sample and send it to you. Once you confirm the sample, mass production will begin according to this sample standard.
3) If the received cargo differs from the confirmed sample and the fault lies on our side, we will assume responsibility and work out a suitable solution.
We are a professional manufacturer specialized in printing and packaging for more than 10 years, with more than 100 workers.
Yes, all of our products are 100% biodegradable and comply fully with European standards.
The lead time for sample production is typically 3-5 days, while mass production takes between 18-25 days depending on the order requirements.